Interactive planning system
| All the activities of enterprise are managed through the Interactive Planning System IBM AS400. |
|

|
Such Interactive System provides a complete central control of all the most important areas of the company.
It supplies a MRP (Material Requirement and Manufacturing Resource Planning) in real time
to manage the material and resources, which is the fundamental
condition for a firm that makes the punctuality and the flexibility its
own major strength. |
 |
|

|
A dedicated suitable “Scheduling system” manages automatically the production activities: workload of lines, progress of specific orders.
The Quality System,
which is integrated inside the Interactive Planning System, produces
collection of data and reports for managing of company’s statistics and
the instantaneous monitoring of the production processes. |
|

|
| In the same way the Technical Documentation is completely inserted in the managerial system and integral part of the Product Planning. |
 |
|